Know how much time take Monel 400 Pipe to delivered in malaysia, Singapore, UK?
The logistics of the Monel 400 pipe is dependent on the support team and the location where you will pick up the parcel from. Generally, Indian customs grant clearance in 24 hours after all the compliances are met. The transportation of the round Monel 400 pipe to Malaysia, Singapore, and the UK take between 3 to 6 working days. The transit time is also dependent on the weight and size of the material you are posting.
Benefits of Monel Pipe
The Monel pipe is a high-strength grade that is resistant to steam at high temperatures. The pipe showcases enhanced resistance to stress corrosion cracking. These pipes have good mechanical properties at sub-zero temperatures up to 1020 degrees F and have good resistance to alkalis. The circular pipes can accommodate large applications while showcasing excellent workability in elevated temperatures. Apart from this, they have good resistance to chloride induced stress corrosion cracking and work well in different conditions.
Price Difference between Monel 400 Seamless Pipe and Alloy 400 Welded Pipe
The price of a Monel 400 seamless pipe in India is $28.53 for a 4 to 7 meter long pipe. The price of a welded alloy 400 pipe starts at $10.32 for the same pipe. The price of the welded pipe will increase if any processing or customization is performed on the grade.
Why choose ASTM B165 UNS N04400 ERW Pipe for seawater service?
The ASTM B165 UNS N04400 ERW pipe is designed with a higher nickel and copper composition. This gives the pipes excellent corrosion and oxidation resistance properties in seawater conditions. The pipes exhibit excellent resistance to seawater and are tolerant to hydrochloric and hydrofluoric acids at modest temperatures. The erw pipes work well with neutral and alkaline salts while showing good tolerance to stress-corrosion cracking induced by chlorides. These features allow it to be used in seawater service systems.
Monel Tube
Monel 400 Tube
Astm B165 Uns N04400 ERW Pipe
Monel 400 Seamless Pipe
Monel 400 Seamless Tube
Monel 400 Welded Pipe
Alloy 400 Pipe
Monel 400 Pipe
Monel Pipe
Monel Tubing
Alloy 400 Tubing
Alloy 400 Welded Pipe
DIN 2.4360 Round Pipe
Alloy 400 Welded Pipe Annealing Process
Annealing may be done at 1700 °F. A stress-relief anneal may be done at 1050 °F for 1 to 2 hours, followed by slow cooling.